Added#
- Every pull request carries a comment that names its next step and who
owns it (#649). A
pr-guideworkflow keeps one comment per pull request, edited in place: linked issue, draft state, failing checks by name, merge conflicts, review, and one line saying what moves it next. The script is owned by Davmunrey/Zolts and tested there; this repository fetches it at a pinned commit and runs it only if its SHA-256 matches. The workflow uses no third-party action,pull_requestrather thanpull_request_target, a least-privilege token, skips forks, and cannot turn a pull request red. - Google's Gemini 4 family and Gemini 3.5 Flash-Lite are priced. Gemini 4
Carbon and Argon at $2/$10 through 2026-11-30 and $4/$20 from 2026-12-01,
Gemini 4 Hydrogen at $1.50/$7.50, each reading its cache at 5% of input,
with batch at half and implicit caching from 4,096 tokens; Gemini 3.5
Flash-Lite at $0.30/$2.50, its cache at 10%. Every figure is from Google's
pricing page, the model pages and its caching page, read 2026-11-16. Until
now a call to any of them read as unpriced. On 2026-12-01 the introductory
price of Carbon and Argon ends, and
pricing-review.test.jsfails that day until it is moved into the rows' history. Google's Flex and Priority tiers are on the page and not in the table: a call on either is priced at the standard rate, and each Gemini 4 row's note says so.per-request-tiers.test.jsholds the four rows to every figure the page prints, standard, batch and cache, on both sides of 2026-12-01; six faults planted in the rows were each caught.
Fixed#
- The card for a shared link broke a project's name across two lines.
docs/assets/social-preview.pngshipped in 2.7.8 withhome-me-etl-pipelinewrapped, because the column it sits in was narrowed to fit a longer dollar figure and the picture was not looked at again. The column is wider, a row no longer wraps, and the image is redrawn. The figures were right throughout; the test that holds them reads the page's text and cannot see a line break.